Turn off MathJax
Article Contents
WANG Hongliang, huang shun, wang yingkun, CHEN Qingling, LI Yiyang, HUANG Kun. Numerical Simulation Study on Prediction of Dynamic Water Inflow Process in the Bailongdong Section of the Yinjiang-to-Hanjiang Water Diversion Project[J]. Bulletin of Geological Science and Technology. doi: 10.19509j.cnki.dzkq.tb202604020
Citation: WANG Hongliang, huang shun, wang yingkun, CHEN Qingling, LI Yiyang, HUANG Kun. Numerical Simulation Study on Prediction of Dynamic Water Inflow Process in the Bailongdong Section of the Yinjiang-to-Hanjiang Water Diversion Project[J]. Bulletin of Geological Science and Technology. doi: 10.19509j.cnki.dzkq.tb202604020

Numerical Simulation Study on Prediction of Dynamic Water Inflow Process in the Bailongdong Section of the Yinjiang-to-Hanjiang Water Diversion Project

doi: 10.19509j.cnki.dzkq.tb202604020
  • Received Date: 09 Apr 2026
  • Accepted Date: 13 Oct 2026
  • Rev Recd Date: 05 Jun 2026
  • Available Online: 29 Oct 2026
  • 【Objective】To address the frequent water inrush hazards in Southwest China's karst tunnels and the inability of traditional static methods to characterize complex hydrological behaviors, 【Methods】this study proposes a coupled simulation method integrating a surface rainfall-runoff model (TOPMODEL) with a groundwater conduit-fissure dual-porosity model (MODFLOW-CFP). For the Bailongdong section of the Yinjiangbuhan Project, a 3D numerical model was developed to represent the concentrated point recharge and diffuse areal infiltration of the underground river system. Calibrated against dynamic outlet discharge data, the model predicted the magnitude and transient process of tunnel water inrush. 【Results】Results indicate that the coupled approach accurately captures the "flashy" impulsive response of the karst system to precipitation, achieving a Nash-Sutcliffe Efficiency (NSE) of 0.88. The simulation reveals a profound risk of conduit-type water inrush when the construction adit excavates through the discharge zone, exposing the main karst conduit. Highly sensitive to rainfall with rapid flow concentration and sharp recession, the peak inrush discharge surges to 24.68 m³/s under a 10-year extreme rainstorm, severely threatening construction safety. Consequently, an alignment optimization scheme is proposed, shifting the tunnel route northward to the upstream recharge area. This adjustment effectively bypasses strongly developed karst zones, reduces the catchment area, and significantly mitigates disaster risks. 【Conclusion】Ultimately, by delivering both the peak discharge and the time-variant hydrograph, this coupled model offers a robust scientific basis for construction organization and water hazard mitigation in complex karst environments.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article Views(3) PDF Downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return